CONTRACTOR FOR CONSTRUCTION, INSTALLATION AND COMMISSIONING OF FOUR (4) FIXED-DO

iDE

Chibombo (Kalola) and Masaiti (Kafulafuta) Districts), Zambia, Central and Copperbelt, Zambia, Central, Zambia · Contract · Posted 9 days ago

iDE ZAMBIA TERMS OF REFERENCE CONTRACTOR FOR CONSTRUCTION, INSTALLATION AND COMMISSIONING OF FOUR (4)FIXED-DOME BIOGAS DIGESTERS Client: International Development Enterprises Location: Chibombo (Kalola) and Masaiti (Kafulafuta) Districts), Zambia Works: Four (4) 6 m³fixed-dome biodigesters Procurement: Open call for technical and financial proposals Contract: Fixed-price, supply-and-install works contract with milestone payments Currency: Zambian Kwacha (ZMW) Indicative Duration: Approximately 48 working days from agreed commencement, subject to approved programme and site readiness. 1. Background and purpose iDE Zambia seeks a qualified biogas construction contractor to supply all required materials and construct, install, test, commission and hand over four fixed-dome anaerobic digesters at approved beneficiary sites. The works comprise two digesters ( 6 m³ units) in each district: The contractor will train users in how to operate the bio-digesters and provide post-commissioning support. The objective is to deliver durable, structurally stable, liquid-tight and gas-tight systems that safely produce and convey biogas and enable appropriate management of digestate (bio-slurry). Approved drawings, technical specifications and the priced Bill of Quantities (BOQ) shall form part of the contract. 2. Scope of works 2.1 Pre-construction engineering and mobilisation - Conduct joint site inspections to confirm access, soil and groundwater conditions, available feedstock and water, safe separation from buildings and water sources, drainage, user needs and gas-pipeline routing. - Confirm digester layout, chamber dimensions, invert levels, inlet/outlet elevations, excavation requirements, slurry arrangements and the construction sequence against approved drawings. - Submit a site-specific method statement, programme, material procurement schedule, quality inspection and test plan, and occupational health and safety plan. Obtain iDE written site approval before permanent works. - Submit for approval the bill of Quantities for each of the bio digester. 2.2 Contractor procurement and material management The contractor shall procure, pay for, transport, unload, inspect, protect and securely store ALL materials, components, consumables and accessories required to complete the works in accordance with the approved BOQ and specifications. This includes masonry units, cement, sand, aggregates, reinforcement, waterproofing materials, formwork, gas pipes and fittings, valves, water traps, hoses, clamps, slurry structures and roofing materials where specified. The contractor shall also provide labour, supervision, plant, tools, testing equipment and personal protective equipment. No material substitution or change to approved specifications is permitted without iDE’s prior written approval. The contractor shall verify quantities and include wastage, transport and handling in the fixed-price quotation; omissions or underestimation in the contractor’s pricing do not transfer procurement responsibility to iDE. 2.3 Civil, masonry and digester construction - Set out and safely excavate to approved dimensions; protect excavations from collapse, surface runoff and unauthorised access; assess founding conditions before placing foundations. - Construct the base, fermentation chamber, fixed dome/gas-holder, inlet and outlet/displacement chambers, inspection points and overflow arrangements in the approved geometry and levels. - Use sound burnt-brick masonry or other approved units, correctly proportioned mortar, specified reinforcement and properly cured concrete/plaster. Ensure continuous bonded joints and stable dome geometry; do not backfill or conceal works before required inspection. - Apply approved internal gas-tight and liquid-tight plaster/waterproofing systems, maintain curing and protect completed surfaces. Backfill in controlled layers without damaging the dome or pipework. 2.4 Biogas conveyance and slurry management…

This is a copy of the posting, as read on November 25, 2026. The employer’s page has the full text and the way to apply.

Source: Workable.