Director, Manufacturing Architecture
Muon Space
San Jose, CA · Posted August 27, 2026
$261,000 – $292,000 a year
About the role Muon seeks a highly experienced Director of Manufacturing Architecture to own and evolve the systems, tools, and processes that our entire spacecraft production engine runs on - PLM, MES, scheduling, and the connective tissue between them. As we scale, we're investing in a next-generation production infrastructure, and we're looking for someone who has built up and driven production systems before to lead that effort - architecting from the ground up where needed, and building on the foundation we already have. The central challenge is versatility: our production infrastructure has to serve three different modes at once: serial/rate production, new product introduction (NPI), and rapid prototyping. You'll architect an infrastructure and operating model that flexes across all three, enabling teams to move quickly on a prototype and repeatedly on a rate build using the same coherent, easy-to-adopt backbone. This person will be a key member of the team and will collaborate closely with Muon Space's head of production, assembly, integration & test (AI&T), quality, supply chain, and mission engineering teams. This role owns the infrastructure layer those production teams depend on. This position is hybrid and requires working on-site in our San Jose, CA office three days per week. Responsibilities - Own the production infrastructure definition end-to-end - PLM, MES, scheduling, and the integrations between them - and drive it into a robust, scalable, well-documented backbone that grows with the company. - Architect for the long term and build pragmatically: assess what exists, build on the parts that work well, and stand up new capabilities where needed - while keeping the system simple and intuitive to adopt. - Design infrastructure capable of accommodating rate production, NPI, and rapid prototyping work. One coherent system that supports both repeatability at scale and speed at the bleeding edge. - Partner with the production and supply chain teams to define the workflows, data models, and processes the tools should enforce, rather than bolting tools onto undefined processes. - Establish the standards, templates, and reusable artifacts (BOM/part/change management, routings, work instructions, scheduling frameworks) that programs and Production TPMs can adopt across missions instead of reinventing them. - Make the systems easy to learn: drive documentation, training, and onboarding so new engineers and TPMs can ramp quickly and rely on the tools with confidence. - Build dashboards and data integrations that give production and leadership clear, real-time visibility into build status, capacity, and constraints across programs. - Coordinate cross-functionally with Information Systems, quality, and supply chain to ensure the infrastructure integrates cleanly with adjacent systems and controls. - Proactively identify and strengthen the critical paths and dependencies in the production stack; drive the roadmap and any migrations without disrupting active builds. - Serve as the integrating owner of production infrastructure - the single point of contact for how spacecraft get planned, tracked, and built through our systems. Qualifications - B.S. in an engineering discipline (M.S. preferred), or equivalent technical experience - a genuine technical background is required. - 8+ years of relevant experience in manufacturing/production, production engineering, and/or technical program management, with significant time spent building up and driving production operations. - Demonstrated track record of standing up, scaling, or overhauling production infrastructure (PLM, MES, scheduling/ERP, and their integrations) into a scalable, maintainable system. - Deep, hands-on experience across multiple production modes - high-rate/serial production, NPI, and prototype/development builds - and an understanding of how infrastructure must differ and flex to serve each.…
This is a copy of the posting, as read on November 25, 2026. The employer’s page has the full text and the way to apply.
Source: Greenhouse.

