Electrical Commissioning Engineer

LotusWorks

Sunnyvale, California, United States · Posted August 26, 2026

$50 – $60 an hour

LotusWorks is an Engineering Services provider specializing in managing Commissioning, Construction Services, Calibration, Operations & Maintenance scopes of work within global manufacturing facilities. LotusWorks operates globally across EMEA and North America partnering with the world's leading manufacturers across the Semiconductor, Pharmaceutical & Biologics, Medical Device and Data Center sectors. Our team of Engineering and Technical professionals is immersed in cutting-edge technologies and innovations. LotusWorks is committed to a diverse and inclusive workplace, integral to our people-first approach. The Electrical Commissioning Engineer is responsible for planning, executing, documenting, and supporting the commissioning of electrical systems within mission-critical facilities. This role oversees electrical commissioning activities from pre-planning and factory testing through construction verification, functional performance testing, integrated systems testing, and post-occupancy support. The ideal candidate has strong experience commissioning high-, medium-, and low-voltage electrical systems and can effectively coordinate with construction, engineering, controls, operations, and commissioning teams. Responsibilities: - Develop and maintain electrical commissioning plans in alignment with ASHRAE standards, project requirements, Cx specifications, Sequence of Operations, LEED Gold requirements, California Title 24, EHS requirements, and the Commissioning Plan/PEP. - Review design documents, project specifications, IFC drawings, and electrical sequences to identify commissioning requirements and potential issues. - Develop and finalize Factory Witness Test (FWT) lists and review factory test submissions with a focus on electrical equipment and systems. - Create electrical system verification checklists and Functional Performance Test (FPT) procedures for OAT, FAT, and IST activities. - Review, validate, and refine electrical Sequences of Operations (SOO) to ensure systems operate as designed. - Lead electrical equipment Factory Witness Testing at manufacturer facilities prior to shipment and document findings for project stakeholders. - Perform construction and installation verification inspections with a focus on electrical systems, equipment, structural supports, code clearances, sensors, and design compliance. - Serve as a Task Leader for designated electrical system testing activities and coordinate testing with other commissioning disciplines. - Execute Operational Acceptance Testing (OAT) on electrical systems and verify proper operation of electrical controls and software. - Perform Functional Acceptance Testing (FAT) to confirm electrical systems operate in accordance with approved sequences, design requirements, and project specifications. - Test intra-system dependencies between electrical systems and other building systems to verify proper operation and control sequences. - Participate in Integrated Systems Testing (IST) to verify coordinated operation between electrical systems and other mission-critical building systems. - Review and verify electrical load bank testing results and document system performance, efficiency, and operating metrics. - Issue Green Tag certification when electrical systems have successfully completed required commissioning activities and are ready for the next phase of testing or acceptance. - Identify, document, and track deficiencies, commissioning issues, and non-conformances through resolution. - Maintain detailed electrical commissioning documentation within the Smart Completions system. - Create and maintain Non-Conformance Logs (NCLs), commissioning punch lists, test records, and system documentation. - Generate comprehensive commissioning reports and provide accurate documentation to project stakeholders and the owner. - Verify electrical systems meet applicable LEED, energy-efficiency, ASHRAE 90.1, code, and project-specific requirements.…

This is a copy of the posting, as read on November 25, 2026. The employer’s page has the full text and the way to apply.

Source: Greenhouse.