Staff Data Center Planner - Space, Power & Cooling

Crusoe

Bellevue, WA - US · Sunnyvale, CA - US · New York, NY - US · San Francisco, CA - US · FullTime · Posted 2 days ago

$200,000 – $240,000 a year

Crusoe is on a mission to accelerate the abundance of energy and intelligence. As the only vertically integrated AI infrastructure company built from the ground up, we own and operate each layer of the stack — from electrons to tokens — to power the world's most ambitious AI workloads. When you join Crusoe, you join a team that is building the future, faster.

We're in the midst of the greatest industrial revolution of our time. The demand for AI compute is boundless, and power is a bottleneck. We're solving that — with an energy-first approach that makes AI infrastructure better for the world and faster for the people innovating with AI.

We're looking for problem-solving, opportunity-finding teammates with a sense of urgency, who believe in the scale of our ambition and thrive on a path not fully paved — people who want to grow their careers alongside a team of experts across energy, manufacturing, data center construction, and cloud services.

If you want to do the most meaningful work of your career, help our customers and partners advance their AI strategies, and be part of a high-performing team that believes in each other, come build with us at Crusoe.

About the Role:

At Crusoe, the Capacity Planning & Efficiency team works where all of Crusoe’s products, services and physical infrastructure meet. As the Staff Data Center Planner for Space, Power & Cooling, you will make sure the following requirements are set for every cluster we plan: data hall space, rack positions, power and cooling that are ready when the hardware arrives. You will work across Crusoe Cloud, our AI cloud platform, and Crusoe’s Digital Infrastructure Group (DIG), which develops, builds and powers our data centers, turning hardware demand into the physical capacity it needs.

The role sits between hardware planning and data center design and operations. You will take forecasted and committed deployments (GPU clusters, CPU and storage servers, network cores) and turn them into rack-level space, power and cooling requirements, check them against what each site can support, and flag gaps early enough to fix them. You will own the data and models that show how much usable capacity we have, where it is stranded, and how to get more out of the sites we already run.

At the Staff level, you will set the direction for this work across the whole portfolio and be the technical authority leadership relies on for physical capacity decisions. This work directly supports Crusoe’s mission to align the future of computing with environmental sustainability.

What You'll Be Working On:

  • Space, Power & Cooling Fit Checks: Validate that each planned deployment fits its target site and data hall, covering rack positions, kW per rack, air and liquid cooling capacity, and power distribution from utility feed down to the rack. Give a clear go, no-go or at-risk call with the conditions attached.
  • Data Hall & Rack Design Inputs: Work with DIG engineering and design teams on data hall layouts, hot aisle containment and row designs, and network core placement. Confirm cabinet power and cooling assumptions for new platforms (for example, 70kW+ liquid-cooled GPU racks) before designs are locked.
  • Capacity Inventory & Modeling: Build and maintain one view of space, power and cooling capacity by site, data hall and row: designed, built, energized, allocated and in use. Replace manual analysis with models that combine all three.
  • Utilization & Efficiency Metrics: Own metrics such as the Capacity Health Index (actual vs. planned kW relative to actual vs. planned rack units), stranded power and stranded space. Recommend oversubscription, re-layout and consolidation strategies that recover usable capacity.
  • Hardware Refresh & Decommissioning: Assess the space, power and cooling impact of retiring older fleets (for example, A100, L40S and MI300X) and replacing them with new platforms, including timing, reuse of existing infrastructure and the sequence of moves.…

This is a copy of the posting, as read on November 27, 2026. The employer’s page has the full text and the way to apply.

Source: Ashby.